SAFETY
All Cemintel™ Fibre Cement sheets must be stacked flat, clear of the ground and supported on a level platform.
Sheets should be lifted by the appropriate number of people dependant on size and weight.
Where it is necessary to store sheets outside, they must be protected from the weather. Sheets must be dry prior to fixing, jointing and finishing.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
When cutting or grinding fibre cement sheets using power tools, always ensure the work area is well ventilated. An approved dust mask (AS1715 and AS1716) and safety glasses (AS1337) must be worn. CSR recommends that hearing protection be worn where appropriate.
MATERIAL SAFETY DATA SHEETS (MSDS)